These pickups were purely for underwater scenes, so we went to a studio in Peterborough where my role had changed from behind-the-scenes videographer and photographer to second AC.
Again I performed my duties as a second AC supporting the first AC and DP where possible, I was not required to do D.I.T as the DP was going to do that once he arrived home, I assisted with the setting up of equipment and the Takedown of equipment, as well as driving actors to & from the station.